Reconstruction of the stadium at Murjāņi Sports Gymnasium was started in 2020. The stadium seat stands were rebuilt, and the surface was renovated with a new base layer and Conica Conipur SW surface covering. Sports equipment was supplied and installed. The works were finished in August 2021.
Stadium at Murjāņi Sports Gymnasium
Year
2021
Stadium surface
7598 m²