Year

2022

Hardwood floor

425 m²

The sports hall of the 1st Riga Medical College was built in the Soviet times in the 70s, the pine floor of that time had settled, the boards were bent in some places, because the base had rotted and it was no longer possible to hold high-quality sports classes. In the summer of 2022, the floor was dismantled, a new concrete base was created, on top of which a shock-absorbing Flex Kombi sports floor with a solid ash wood top layer was laid. Area 425 m2. After laying the floor in the gym, we replaced the basketball shield and hoops by installing new, modern glass shields in a metal frame with spring hoops.

Equipment and inventory brands

We can help you

We will submit the cost estimate, send the transport costs.

Contact us